Drainage basin response

Start questions

Unofficial selected-topic practice.

Practice scope

Original English practice with worked guidance. Selected topics only. This is not a complete syllabus, official past-paper collection or predicted exam score. Check your own exam-board specification: these concepts are not certified against a particular board or exam year. Where a question shows a Cambridge 2027 reference, that is a conceptual placement only; no other exam board (such as Edexcel, AQA or OCR) is mapped, so do not assume this covers your board. Content here is written and checked with AI assistance; it has not been approved by an independent teacher or endorsed by any exam board.

112 original questions across 14 selected topic areas. No account or payment required to practise.

Cambridge International AS & A Level Geography (9696), examination year 2027: Conceptual alignment to official sources, not exam-board certification. Syllabus mapping and remaining coverage.

6 questions in this topic

Original questions with indicative worked guidance. Selected topics only.

All topics

Original board-neutral short-answer practice. Selected concepts, not complete syllabus coverage.

6 of 6 questions shown

Loading saved responses

Question 1Hide question2 indicative marks

Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Distinguish infiltration from surface runoff and explain their effect on response time.

Cambridge 2027: Direct conceptual match

Distinguishes entry into soil from overland runoff, with conditional subsurface delay.

Conceptual placement only, not official Cambridge endorsement or complete syllabus coverage.

Show indicative guidance

Worked guidance

  1. Follow a raindrop along two routes. Entry into soil generally delays channel arrival relative to connected overland flow, though soil and slope conditions matter.
  2. Award each point once. Accept other well-supported interpretations addressing the task.

Self-marking points

Tick what your working earned. The count is your own self-assessment.

Self-assessed: not counted yet. This question is worth 2 marks.

Examiner tip

Do not confuse infiltration into soil with percolation through it.

Question 2Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Calculate annual change in storage and state whether storage rises or falls.2 indicative marks

Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Calculate annual change in storage and state whether storage rises or falls.

Cambridge 2027: Direct conceptual match

900-520-330 gives +50 mm storage change, not a discharge rate.

Conceptual placement only, not official Cambridge endorsement or complete syllabus coverage.

Show indicative guidance

Worked guidance

  1. Rearrange the supplied balance to storage change = input minus the two outputs. The 50 mm is a depth equivalent across the basin, not a channel discharge.
  2. Award each point once. Accept other well-supported interpretations addressing the task.

Self-marking points

Tick what your working earned. The count is your own self-assessment.

Self-assessed: not counted yet. This question is worth 2 marks.

Examiner tip

Preserve the positive sign and the millimetre unit.

Question 3Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Explain how urban surfaces can produce the changed peak and lag.3 indicative marks

Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Explain how urban surfaces can produce the changed peak and lag.

Cambridge 2027: Direct conceptual match

Peak 50 to 80 and lag 5 to 2 hours illustrate changed response; not isolated causal proof.

Conceptual placement only, not official Cambridge endorsement or complete syllabus coverage.

Show indicative guidance

Worked guidance

  1. Link the mechanism as a chain: less water enters storage, faster transfer concentrates arrival, and the river peak rises. The dataset is consistent with this chain but does not isolate every cause.
  2. Award each point once. Accept other well-supported interpretations addressing the task.

Self-marking points

Tick what your working earned. The count is your own self-assessment.

Self-assessed: not counted yet. This question is worth 3 marks.

Examiner tip

Give a process linking surface change to the hydrograph, not just 'urbanisation causes floods'.

Question 4Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Explain why equal storm size does not make this a conclusive causal test.3 indicative marks

Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Explain why equal storm size does not make this a conclusive causal test.

Cambridge 2027: Direct conceptual match

Equal storm totals leave rainfall intensity and antecedent moisture uncontrolled.

Conceptual placement only, not official Cambridge endorsement or complete syllabus coverage.

Show indicative guidance

Worked guidance

  1. Controlling total rainfall removes one difference, not all differences. Compare intensity and wetness before interpreting the before/after contrast as an urbanisation effect.
  2. Award each point once. Accept other well-supported interpretations addressing the task.

Self-marking points

Tick what your working earned. The count is your own self-assessment.

Self-assessed: not counted yet. This question is worth 3 marks.

Examiner tip

Control of one variable is not control of the whole catchment.

Question 5Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Assess whether permeable paving alone is an adequate response to the raised peak.4 indicative marks

Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Assess whether permeable paving alone is an adequate response to the raised peak.

Cambridge 2027: Partial conceptual match

Permeable paving is conditional flood mitigation; no recent authentic case study.

Conceptual placement only, not official Cambridge endorsement or complete syllabus coverage.

Show indicative guidance

Worked guidance

  1. A local infiltration measure addresses one mechanism. Basin protection may also require detention, restored floodplain storage and limiting exposure; adequacy depends on how much runoff the paving actually intercepts.
  2. Award each point once. Accept other well-supported interpretations addressing the task.

Self-marking points

Tick what your working earned. The count is your own self-assessment.

Self-assessed: not counted yet. This question is worth 4 marks.

Examiner tip

Judge scale and capacity, not merely whether a measure has some benefit.

Question 6Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Design a before/after investigation to test a detention pond's effect on flood peaks.4 indicative marks

Fictional teaching dataset, not an observed basin: annual precipitation P = 900 mm, evapotranspiration E = 520 mm, runoff Q = 330 mm. Use P = E + Q + change in storage. After urbanisation, an equal storm produces a peak of 80 rather than 50 m³/s and a lag of 2 rather than 5 hours. Storm size is controlled; antecedent moisture is unknown. Design a before/after investigation to test a detention pond's effect on flood peaks.

Cambridge 2027: Partial conceptual match

Repeated matched storms and a comparison basin test detention; a study design, not demonstrated case effectiveness.

  • 9696: AO2: Use resources, numerical methods and analysis
  • 9696: 1.3.3: Flood management and a real case

Conceptual placement only, not official Cambridge endorsement or complete syllabus coverage.

Show indicative guidance

Worked guidance

  1. One small storm after construction cannot demonstrate success. Repeated event comparisons and a control help distinguish the pond from weather variation; automated sensors reduce exposure to hazardous flow.
  2. Award each point once. Accept other well-supported interpretations addressing the task.

Self-marking points

Tick what your working earned. The count is your own self-assessment.

Self-assessed: not counted yet. This question is worth 4 marks.

Examiner tip

Do not send students into a flooded channel to collect peak measurements.

All AS & A Level subjects